(The Standard)

One standard.

Insula buildings look different on purpose. These seven commitments are what makes them the same. Each one is a clause in your contract, and each one is measured before you get the keys.

A building can borrow its face from the street. It cannot borrow its ceilings, its silence or its air. Those we bring with us, every time.

01 / 07

3.0 m

Ceilings

Floor to ceiling, in every room, on every floor. Rooms feel larger than their area because they are taller, and tall windows bring light deeper into the plan.

Measured in every room at handover. Minimum 2.95 m after finishes.

01 / 07

3.0 m

Ceilings

Floor to ceiling, in every room, on every floor. Rooms feel larger than their area because they are taller, and tall windows bring light deeper into the plan.

Measured in every room at handover. Minimum 2.95 m after finishes.

02 / 07

58 dB

Quiet floors

Acoustic slabs between every home, tested on site before handover. You hear the city through the window, not your neighbours through the ceiling.

Impact and airborne sound tested by an independent lab on two homes per floor.

02 / 07

58 dB

Quiet floors

Acoustic slabs between every home, tested on site before handover. You hear the city through the window, not your neighbours through the ceiling.

Impact and airborne sound tested by an independent lab on two homes per floor.

03 / 07

2 sides

Air that moves

Every home has windows on at least two facades, so air crosses it on its own and nobody lives facing a light well.

Shown on every floor plan before you sign. There are no single-aspect homes.

03 / 07

2 sides

Air that moves

Every home has windows on at least two facades, so air crosses it on its own and nobody lives facing a light well.

Shown on every floor plan before you sign. There are no single-aspect homes.

04 / 07

200 km

Near materials

Stone, brick, timber and tile come from within 200 km of the site wherever the region makes them. It is why each building looks like its city.

Each building has a material passport listing every supplier and distance.

04 / 07

200 km

Near materials

Stone, brick, timber and tile come from within 200 km of the site wherever the region makes them. It is why each building looks like its city.

Each building has a material passport listing every supplier and distance.

05 / 07

100%

Windows that open

Every window opens fully. No sealed glass, no token vents, no locked panes for the cleaning company.

Every window is opened and closed by the site manager before handover.

05 / 07

100%

Windows that open

Every window opens fully. No sealed glass, no token vents, no locked panes for the cleaning company.

Every window is opened and closed by the site manager before handover.

06 / 07

1 name

One site manager

One named person runs each site from the first pour to the keys, and answers your calls. You meet them before you buy and they are still there at handover.

Their name and direct number are written into your sales contract.

06 / 07

1 name

One site manager

One named person runs each site from the first pour to the keys, and answers your calls. You meet them before you buy and they are still there at handover.

Their name and direct number are written into your sales contract.

07 / 07

10 yrs

Structural warranty

Ten years on the structure, written into the deed and transferable if you sell. We repair what we built, whoever owns it.

Backed by an insured guarantee registered with the deed.

07 / 07

10 yrs

Structural warranty

Ten years on the structure, written into the deed and transferable if you sell. We repair what we built, whoever owns it.

Backed by an insured guarantee registered with the deed.

(How a building is made)

From the street
to the keys.

Step 01

Read the street

Six months on the site before a line is drawn: light, noise, neighbours, what the street is made of.

Step 02

Draw it locally

A local architect draws the building with us, so it belongs to its street and its planning rules from the first sketch.

Step 03

Build to the Standard

Seven written commitments, checked on site by the same manager from the first pour to the last coat of paint.

Step 04

Hand over, then stay

Keys come with a walk-through, the ten-year warranty and a phone number that still answers a year later.

Create a free website with Framer, the website builder loved by startups, designers and agencies.